Development of two layered cable joints, branches and junction boxes with insulating and conductive

The project is aimed at the construction of electrical switches, joints, or branches especially in the branches of solar power and wind power generation consisting of an outer shell of high resistivity material, a first conductive gel layer to act as a charge eliminator, a second non-conductive gel layer with high insulation power, UV stability, and inherent flame retardance, the two layers are made of label-free materials with a resistance of 10^6 Ω in first and 10^16 Ω in the second layer
Acronym: 
Doublelayer
Project ID: 
9 712
Ranking: 
46
Cut-off: 
3
Start date: 
01-10-2015
Project Duration: 
30months
Project costs: 
1 413 630.00€
Technological Area: 
Transmission of electricity
Market Area: 
Other Energy